Engineering

From study to operation

Technology alone does not build a plant. For each project, ITC assembles the consortium, coordinates design, procurement and construction, and stays on as your contact during operation.

Project phases, one team
6
Point of contact in Berlin
1
Containers per H2 plant
2 to 12

Scope of work

Six phases, one project team.

We cover the phases a project needs, individually or as a complete package.

  1. 01

    Design

    Site requirements, feasibility studies, permits and detailed engineering.

    Feasibility · Permits
  2. 02

    Construction

    Site preparation, procurement of all materials, installation of equipment and systems.

    Procurement · Installation
  3. 03

    Commissioning

    Pre-commissioning, integrated system tests and proof of the guaranteed performance.

    Testing · Handover
  4. 04

    Maintenance

    Scheduled inspections, preventive maintenance and repairs for reliable operation.

    Inspection · Repair
  5. 05

    Operation

    Day-to-day plant management, performance monitoring and regulatory compliance.

    Operations · Monitoring
  6. 06

    Optimization

    Data analysis, performance improvement, higher productivity and lower cost per unit produced.

    Data · Efficiency

How we work

One consortium for every project.

An energy project in the Middle East or North Africa needs technology owners, manufacturers, engineers, financiers and a partner who builds on site. ITC brings these parties together and manages the interfaces between them.

In Egypt, our exclusive execution partner EGTC delivers all ITC projects and ensures compliance with national frameworks. In the Gulf, ITC is backed by a strategic shareholder from Kuwait.

  • Technology from Germany and Europe
  • Production lines from Italy
  • Delivery on site through local partners
  • Project management from Berlin
Precision-machined stainless steel flange on a heat exchanger

What we deliver

Delivery options.

Solar

PV-T power plants

Hassabou collector fields with thermal storage, sized to the site's demand for power, heat and steam.

24 h2.5 to 3 ha/MW
Hydrogen

PWT container plants

Standard plants from 1,000 to 10,000 l/h, pre-assembled on frames in 40 ft container size. Compressor and bottling on request.

H2 5.02 to 4 technicians per shift
Manufacturing

Turnkey PV module lines

Lines from 20 to 300 MW per year with training, installation, commissioning and remote support by Ecoprogetti.

Made in ItalyISO 9001:2015
Studies

Feasibility and economics

Site assessment, yield and cost modelling, technology selection and a permitting roadmap as the basis for investment decisions.

Questions

Common questions about engineering.

Which countries does ITC work in?

Our focus is the Middle East, North Africa and the Gulf states. In Egypt we work with our exclusive execution partner EGTC, in the Gulf with a strategic shareholder from Kuwait.

Does ITC take on single phases?

Yes. We can deliver a feasibility study, handle procurement or take a project all the way to operation.

How does a project start?

With a conversation about site, demand and timeline. From that we put together a proposal for the technology mix, partners and next steps.

The river Spree in Berlin-Moabit at blue hour

Contact

Planning an energy project in MENA or the Gulf?

Tell us about the site, the demand and the timeline. We'll come back with the right technology mix and the right partners.

Start a conversation